Retain the frame
A damaged pane may need new glass, not a new storefront. Frame condition, anchoring and suitability for the replacement glass need review first.
Storefront glass replacementStorefront repairs, replacement glass
and planned entrance work.
Glassma works on commercial glass, storefronts and doors across Seattle and Puget Sound. Start with the opening that needs attention, whether that means replacing a pane, repairing a door or reviewing a larger storefront scope.

Glass damage, frame condition and door movement call for different decisions. Review them together before choosing the extent of the work.

A damaged pane may need new glass, not a new storefront. Frame condition, anchoring and suitability for the replacement glass need review first.
Storefront glass replacementWhen framing and the entrance need work together, consider the glass, doors, sidelites and transoms as one scope. Confirm the proposed system and its requirements for this property.
Storefront installation and replacementScraping, sagging or uncontrolled closing may involve the frame, pivots, closer or other hardware. Identify the operating problem before assuming the glass or entire door needs replacement.
Commercial door repairA confirmed glass replacement at an eyewear storefront.


Damaged glass at this eyewear storefront needed replacement. Glassma replaced it in the existing opening. The second photograph shows the replacement glass in place.
This is glass replacement, not a full framing renovation. Tools remain at the frontage in the second view; it records the replacement stage, not the completion of all surrounding work.
See more storefront photographsMaterials, the opening and other trades depend on one another. Use these questions to agree responsibilities for your project, rather than assume a standard ordering or site procedure.

An installed entrance does not mean the surrounding work is complete. Opening preparation, waterproofing and finishes need their own agreed responsibilities.
Planning work at an occupied propertyWhich openings are included? Share the current plans or photos, available dimensions and specified glass or door requirements. Ask which details need clarification and whether the proposed work fits the project.
Who confirms final measurements and approves the specification? Agree how revisions or proposed substitutions will be reviewed, and what approval is needed before an order can proceed.
Who prepares the opening and handles adjacent framing, waterproofing and finishes? Confirm readiness for measurement and installation, material availability, access, deliveries and any temporary protection.
Who reviews the glazing and door operation? Identify remaining work by each trade and ask which product records, maintenance guidance or other documents can be provided.
Have plans ready? The inquiry section also has a direct email path.
Drawing packages, specified systems and site constraints can leave questions to resolve.
Yes. Email the current plans, specifications and site address, along with the openings included and your timing requirements. Identify the drawing revision and any open questions. Confirm the review needed and the proposed scope before treating the package as ready for pricing or ordering.
Include that requirement in the inquiry, along with any safety, fire-rating, accessibility or security requirements. Ask whether the specified work can be supported. System suitability, substitutions and approval responsibilities need confirmation for the project.
Glass specifications, material availability, opening condition and access all affect timing. Include any tenant hours, restricted work windows or other-trade dependencies. The schedule needs to be discussed against those conditions, rather than assumed from a single lead time.
Call to discuss the immediate condition. Temporary board-up or door stabilization may be needed separately from the permanent replacement. Ask what protection and access arrangements are needed while the final scope and materials are being resolved.
Send the current drawings, specifications and site address by email. Include the revision, openings in scope and any access restrictions so the project questions stay with the documents.
Still defining the work? Use the short inquiry form. Photos and further details can follow by email; there is no need to fit a drawing package into the message.
If broken glazing leaves the property unsecured, call to discuss the immediate concern.
Have a question before requesting a quote? Open a chat with our team.
Share your city or ZIP code and a short description.
Sending a request does not book an appointment. We will confirm the details and next step with you.
You can also request a quote by phone or email.
With your permission, we save advertising identifiers and the page you arrived on for up to 30 days in this browser. If you request a quote, we include these details with your inquiry so we can connect advertising to completed jobs.
Your choice does not affect requesting a quote. This controls Glassma's inquiry attribution. You can change it here at any time; changing it does not remove details already submitted.